WEG Transformers USA

Manufacturer of Distribution & Power Transformers

  • About
  • Products
    • Distribution Transformers
      • Padmount Units
      • Renewable Padmount Units
      • Secondary Units
    • Power Transformers
      • Padmount Units
      • Substation Units
  • Library
    • Certifications
      • FM Certification
      • ISO Certification
      • UL Certification
    • Claim Form
    • Manuals
      • WEG Transformers USA DT Renewable Pad Manual
      • WEG Transformers USA DT Pad Manual (EN)
      • WEG Transformers USA DT Pad Manual (SPAN)
      • WEG Transformers USA DT Pad Manual (FR)
      • WEG Transformers USA DT Secondary Unit Manual
      • WEG Transformers USA Medium Power Pad Manual (EN)
      • WTU Commissioning Procedure
      • Component Replacement Procedures
        • Fan Setting
        • Liquid Temperature Gauge Replacement
    • Technical Information
      • WEG Specification Builder (DT Pad mounts)
      • Guideline C57.159-2016
      • Handling and Lifting MVT’s
      • Long Term Inspection Checklist
      • Long Term Storage Form
      • Prior to Energization Checklist
      • Prior Energization Procedure List
    • Terms & Conditions of Sales
      • WEG T&C Distribution Transformers PDF
      • WEG T&C Power Transformers PDF
    • Warranty
    • Terms & Conditions of Supply Chain
    • Literature
      • English
      • Spanish
  • Escalations
    • Distribution Transformers
      • Long Term Contracts
      • Spot Term Contracts
    • Power Transformers
  • News
  • Contact
  • Careers
  • Ethics
    • Code of Ethics
    • Code of Ethics for Suppliers
    • Policy for Preventing and Combating Corruption
    • Privacy Notice
    • Reporting Channel
  • Investor Services

Feb 25 2022

Price Adjustment Notification at time of Shipment

Over the past twelve months, WEG Transformers USA (WEG) has tried to mitigate key transformer material price increases for all distribution transformer products.

Pricing for key transformer commodities remain elevated. WEG would like to point out that our suppliers are passing on these price increases to us. We do not have the financial capacity to absorb these abnormal price increases.

As we foresee volatility throughout 2022, at a high inflationary level, combined with unprecedented long lead times, we have no other course of action than to pass these price increases to all our customers “at time of shipment”. It is to our great disappointment that we are forced to implement the price adjustment model for all distribution products markets as outlined on https://weg.us/material-prices/

Starting March 1, 2022 all our new shipments will reflect this price adjustment model.

We do understand that it is difficult to cope with this particular situation which is beyond our control; hence therefore this notification. Thank you for your understanding and continued support of WEG Transformers USA.


Marc Schillebeeckx
VP – Transformers USA

Written by Marc De Wever · Categorized: Company Announcement

WEG Transformers USA

Main Line: (636) 239-9300
Fax: (636) 239-9395

MAIN OFFICE
6350 WEG Drive
Washington, Missouri 63090

Products

DISTRIBUTION TRANSFORMERS
  Padmount Units
  Renewable Padmount Units
  Secondary Units
  Polemount Units

POWER TRANSFORMERS
  Padmount Units
  Substation Units

WEG Transformers USA

Library

TECHNICAL INFORMATION
  WEG Specification Builder (DT Pad mount)

TERMS & CONDITIONS OF SALE
  T&C Distribution Transformers
  T&C Power Transformers

WARRANTY

Privacy Policy | Terms & Conditions | © 2025 WEG USA. All rights reserved. | Website by Off-Center Design

Claim Form

Please fill out the following information and attach any relevant specifications, photos, or drawings. After submitting a Claim Form, please allow 2 – 5 business days for a WEG account specialist to review and reach out to you.

  • Customer Information

  • Select date MM slash DD slash YYYY
  • Order Information

    Please complete at least one field.
  • Project Information

  • Claim Information - If after any intervention a claim is defined as non-warranty, WTU will charge the incurred service cost + administration fees

  • Select date MM slash DD slash YYYY
  • Drop files here or
    Max. file size: 50 MB.
      Please attach as much information/evidence as possible so that we can fully understand the issue and find the most efficient resolution.

    Request a Quote

    Please fill out the following information and attach any relevant specifications or drawings. After submitting a request, please allow 2 – 5 business days for a WEG account specialist to send an official quotation.

    • Please include key unit requirements (KVA, HV, LV, Feed, Bushings, Etc.) for accurate pricing.
    • Max. file size: 50 MB.
    • Please include shipping location, project name, end user, etc.

    Notifications