WEG Transformers USA

Manufacturer of Distribution & Power Transformers

  • About
  • Products
    • Distribution Transformers
      • Padmount Units
      • Renewable Padmount Units
      • Secondary Units
    • Power Transformers
      • Padmount Units
      • Substation Units
  • Library
    • Certifications
      • FM Certification
      • ISO Certification
      • UL Certification
    • Claim Form
    • Code of Ethics
    • Manuals
      • WEG Transformers USA DT Renewable Pad Manual
      • WEG Transformers USA DT Pad Manual (EN)
      • WEG Transformers USA DT Pad Manual (SPAN)
      • WEG Transformers USA DT Pad Manual (FR)
      • WEG Transformers USA DT Secondary Unit Manual
      • WEG Transformers USA Medium Power Pad Manual (EN)
      • WTU Commissioning Procedure
      • Component Replacement Procedures
        • Fan Setting
        • Liquid Temperature Gauge Replacement
    • Technical Information
      • WEG Specification Builder (DT Pad mounts)
      • Guideline C57.159-2016
      • Handling and Lifting MVT’s
      • Long Term Inspection Checklist
      • Long Term Storage Form
      • Prior to Energization Checklist
      • Prior Energization Procedure List
    • Terms & Conditions of Sales
      • WEG T&C Distribution Transformers PDF
      • WEG T&C Power Transformers PDF
    • Warranty
    • Terms & Conditions of Supply Chain
    • Literature
      • English
      • Spanish
  • Escalations
    • Distribution Transformers
      • Long Term Contracts
      • Spot Term Contracts
    • Power Transformers
  • News
  • Contact
  • Careers
  • Investor Services

Apr 07 2022

Groundbreaking ceremony for medium power transformer plant expansion

Ground-breaking

We are proud to announce that WEG is investing in our medium power transformer plant located in Washington, MO – USA, an investment of over 10 Million USD.

The ground breaking, March 29, 2022, of the additional medium power transformer production line will provide more accessible capacity for our existing Utility customers as well as new Utility customers. The new medium power transformers production line expansion will entail a state-of-art winding room together with new assembly platforms for core and coils.

It is estimated that this expansion will be operational on March 31, 2023.

WEG has over the last five (5) years invested close to 47 Million USD in their US Transformer facilities.

Marc Schillebeeckx
VP – Transformers USA

Written by Marc De Wever · Categorized: Company Announcement

WEG Transformers USA

Main Line: (636) 239-9300
Fax: (636) 239-9395

MAIN OFFICE
6350 WEG Drive
Washington, Missouri 63090

Products

DISTRIBUTION TRANSFORMERS
  Padmount Units
  Renewable Padmount Units
  Secondary Units
  Polemount Units

POWER TRANSFORMERS
  Padmount Units
  Substation Units

WEG Transformers USA

Library

TECHNICAL INFORMATION
  WEG Specification Builder (DT Pad mount)

TERMS & CONDITIONS OF SALE
  T&C Distribution Transformers
  T&C Power Transformers

WARRANTY

Privacy Policy | Terms & Conditions | © 2023 WEG USA. All rights reserved. | Website by Off-Center Design

Cookie Disclaimer
This site uses cookies in order to improve your online experience. Detailed information on the use of cookies on this website is provided in our Privacy Policy. By continuing to browse the site you are agreeing to our use of cookies.
Cookie settingsACCEPT
Privacy & Cookies Policy

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may affect your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Non-necessary
Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.
SAVE & ACCEPT
Claim Form

Please fill out the following information and attach any relevant specifications, photos, or drawings. After submitting a Claim Form, please allow 2 – 5 business days for a WEG account specialist to review and reach out to you.

  • Customer Information

  • MM slash DD slash YYYY
  • Order Information

    Please complete at least one field.
  • Project Information

  • Claim Information - If after any intervention a claim is defined as non-warranty, WTU will charge the incurred service cost + administration fees

  • MM slash DD slash YYYY
  • Drop files here or
    Max. file size: 50 MB.
      Please attach as much information/evidence as possible so that we can fully understand the issue and find the most efficient resolution.

    Request a Quote

    Please fill out the following information and attach any relevant specifications or drawings. After submitting a request, please allow 2 – 5 business days for a WEG account specialist to send an official quotation.

    • Please include key unit requirements (KVA, HV, LV, Feed, Bushings, Etc.) for accurate pricing.
    • Max. file size: 50 MB.
    • Please include shipping location, project name, end user, etc.